The IUOE Training Center in Crosby Texas installed a Potain IGO T99 self-erecting tower crane using DICA’s EcoMax Crane Pads. These engineered pads ensure safe load distribution on improved ground conditions. DICA’s durable composite design supports training with professional equipment and ground protection solutions….
You May Also Like
-
Skanska to Deliver East Side Greenway 14th Street Connector Project in New York City
Ryan Calloway2 days agoSkanska has been selected by the New York City DDC as the design-builder to deliver the East Side Greenway 14th Street Connector project.... -
SUPER 2100-5 X Paver Supports Highway Rehabilitation in Germany
Ryan Calloway2 days agoA SUPER 2100-5 X paver with a 12-meter screed and a Hamm HX 90 tandem roller with Smart Compact Pro worked together on the rehabilitation project.... -
$1.8B Asheville Connector Project Under Way
Ryan Calloway2 days agoThe Asheville I-26 Connector project will widen existing I-26/I-240, build a new interstate alignment across the French Broad River and upgrade several interchanges. ... -
VIDEO: Tennessee Advances $9.2B I-24 Choice Lanes Project
Ryan Calloway2 days agoTennessee is advancing a $9.2 billion project to add optional lanes to approximately 26 mi. of Interstate 24 between Nashville and Interstate 840....
