The $284 million Chester Bridge project nears completion, replacing the aging Mississippi River span between Chester, Ill and Perry County, Mo. The new three-tower cable-stayed bridge will double the width to 44 ft and open to traffic by July 2026. Construction crews overcame flooding and wind delays, with demolition of the old bridge set to begin soon….
You May Also Like
-
Shawmut Design to Break Ground on 111,000-Sq-Ft Lowell Microelectronics Center
Ryan Calloway1 day agoThe IMPACT Center will expand domestic chip production and packaging and anchor the Lowell Innovation Network Corridor (LINC) ... -
Kenworth Enhances Class 8 Truck Lineup, New In-Cab Technology
Ryan Calloway1 day agoThe updates are designed to provide drivers with greater comfort, convenience and functionality while creating a more modern in-cab experience.... -
Cherry On Top: ALL’s New Liebherr LTM 1400-6.1 Sets Observation Deck Atop Auburn’s New Airport Control Tower
Ryan Calloway1 day agoALL Crane Rental of Georgia used its new Liebherr LTM 1400-6.1 to lift a 94,000-pound observation deck onto Auburn University Regional Airport’s new control tower. Careful planning... -
Tadano CC 38.650-1 Hoists Tram Bridge in Urban Bologna
Ryan Calloway1 day agoAutovictor used a Tadano CC 38.650-1 lattice boom crawler crane to position bridge....
